Already a subscriber? 

MADCAD.com Free Trial
Sign up for a 3 day free trial to explore the MADCAD.com interface, PLUS access the
2009 International Building Code to see how it all works.
If you like to setup a quick demo, let us know at support@madcad.com
or +1 800.798.9296 and we will be happy to schedule a webinar for you.
Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?
BS EN 16903:2025 Plastic piping systems buried outside the building structure. Environmental product declarations. Product category rules complementary to EN 15804, 2025
- undefined
- European foreword
- Introduction
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- 4 Abbreviations
- 5 General aspects [Go to Page]
- 5.1 Objective of the PCR for plastic piping systems buried outside the building structure
- 5.2 Types of EPD with respect to life cycle stages covered
- Figure 1 — Types of EPD with respect to life cycle stages covered and life cycle stages and modules for the construction works assessment [Go to Page]
- 5.3 Comparability of EPD for construction products
- 5.4 Additional information
- 5.5 Ownership, responsibility and liability for the EPD
- 5.6 Communication formats
- 6 Product category rules for LCA [Go to Page]
- 6.1 Product category
- 6.2 Life cycle stages and their information modules to be included [Go to Page]
- 6.2.1 General
- 6.2.2 A1-A3, Product stage, information modules
- 6.2.3 A4-A5, Construction process stage, information modules
- 6.2.4 B1-B5, Use stage, information modules related to the plastic piping systems buried outside the building structure
- 6.2.5 B6-B7, use stage, information modules related to the operation of the plastic piping systems buried outside the building structure
- 6.2.6 C1-C4 End-of-life stage, information modules
- 6.2.7 D, Benefits and loads beyond the system boundary, information module
- 6.3 Calculation rules for the LCA [Go to Page]
- 6.3.1 Functional or declared unit
- 6.3.2 Functional unit
- 6.3.3 Declared unit
- 6.3.4 Reference service life (RSL)
- 6.3.5 System boundaries [Go to Page]
- 6.3.5.1 General
- 6.3.5.2 Product stage
- 6.3.5.3 Construction stage
- 6.3.5.4 Use stage [Go to Page]
- 6.3.5.4.1 General
- 6.3.5.4.2 B1-B5 Use stage information modules of the piping system
- 6.3.5.4.3 B6 – B7 Use stage information modules related to the operation of the piping system
- 6.3.5.5 End-of-life stage
- 6.3.5.6 Benefits and loads beyond the product system boundary in module D
- 6.3.6 Criteria for the exclusion of inputs and outputs
- 6.3.7 Selection of data [Go to Page]
- 6.3.7.1 General rules
- Table 1 — Application of generic and specific data [Go to Page]
- 6.3.7.2 Data for electricity
- 6.3.8 Data quality requirements
- 6.3.9 Developing product level scenarios [Go to Page]
- 6.3.9.1 General
- 6.3.9.2 A4 Transportation from the production gate to the construction site
- 6.3.9.3 A5 Installation
- 6.3.9.4 Use stage
- 6.3.9.5 End-of-life
- 6.3.10 Units
- 6.4 Inventory analysis [Go to Page]
- 6.4.1 Collecting data
- 6.4.2 Calculation procedures
- 6.4.3 Allocation of input flows and output emissions [Go to Page]
- 6.4.3.1 General
- 6.4.3.2 Co-product allocation
- 6.4.3.3 Allocation procedure of reuse, recycling and recovery
- 6.4.4 Information on biogenic carbon content
- 6.5 Impact assessment
- 7 Content of the EPD [Go to Page]
- 7.1 Declaration of general information
- 7.2 Declaration of environmental indicators derived from LCA
- 7.3 Scenarios and additional technical information [Go to Page]
- 7.3.1 General
- 7.3.2 Construction process stage [Go to Page]
- 7.3.2.1 A4, Transport to the construction site
- 7.3.2.2 A5, Installation in the trench
- Table 2 — Installation of the plastic piping system buried outside the building structure in the trench [Go to Page]
- 7.3.3 B1-B7 use stage [Go to Page]
- 7.3.3.1 Reference service life
- 7.3.3.2 B6, use of energy and B7, use of water
- 7.3.4 End-of-life
- Table 3 — End-of-life of the plastic piping system buried outside the building structure in the trench [Go to Page]
- 7.4 Additional information on release of dangerous substances to, soil and ground water during the use stage [Go to Page]
- 7.4.1 Indoor air
- 7.4.2 Soil and ground water
- 7.5 Aggregation of information modules
- 8 Project report [Go to Page]
- 8.1 General
- 8.2 LCA-related elements of the project report
- 8.3 Documentation on additional information
- 8.4 Data availability for verification
- 9 Verification and validity of an EPD
- Annex A (informative) Waste
- A.1 End-of-waste
- Figure A.1 — Decision-tree for end-of-waste
- A.2 Properties of hazardous wastes for Table 5 of EN 15804:2012+A2:2019
- Annex B (informative) Examples for functional and declared units
- B.1 Example 1: Functional unit - Life cycle assessment of a PE piping system buried outside the building structure for water distribution – pressure system
- Figure B.1 — Drawing of the PE water distribution system
- Table B.1 — Bill of materials of the PE piping system
- B.2 Example 2: Functional unit -Life Cycle Assessment of a buried solid wall sewer pipe system
- Table B.2 — Bill of the materials of the PVC-U solid wall sewer
- Figure B.2 — Drawing of the sewer pipe system (Example 2 and 3)
- B.3 Example 3: Declared unit -Life Cycle Assessment of a double wall plastic non-pressure gravity pipe for surface water drainage
- Table B.3 — Bill of the materials of the PP double wall plastic non-pressure gravity pipe
- Annex C (informative) List of product standards
- Annex D (informative) Applications and intended used of plastic piping systems buried outside building structure
- Table D.1 — Applications and intended use of plastic piping system outside the building structure
- Annex E (informative) Reading guide
- Bibliography [Go to Page]