Already a subscriber? 

MADCAD.com Free Trial
Sign up for a 3 day free trial to explore the MADCAD.com interface, PLUS access the
2009 International Building Code to see how it all works.
If you like to setup a quick demo, let us know at support@madcad.com
or +1 800.798.9296 and we will be happy to schedule a webinar for you.
Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?
ISO 10794:2018 Space systems - Programme management - Material, mechanical parts and processes, 2018
- Foreword
- Introduction
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- 4 Abbreviated terms
- 5 General requirements
- 5.1 Materials, Mechanical Parts and Processes Programme (MMPP) management requirement
- 5.1.1 Overview
- 5.1.2 MMPP plan
- 5.1.3 Management
- 5.1.4 Material, Mechanical Parts, Processes Control Board (MPCB)
- 5.2 Management and consolidation of the activities
- 5.2.1 Relationship
- 5.2.2 Establishing and processing of lists
- 5.2.3 Management of the lists
- 5.2.4 Supplier role and responsibilities
- 5.3 Technical constraints
- 5.4 Cleanliness and contamination control
- 5.5 Safety hazardous parts and materials
- 5.6 Optical, mechanical or electrical GSE hardware
- 6 Material control
- 6.1 Technical criteria for selection of materials
- 6.2 Selection
- 6.3 Declared materials list content
- 6.4 Criticality analysis
- 6.5 Evaluation and validation phases
- 6.5.1 General
- 6.5.2 Evaluation phase
- 6.5.3 Validation phase
- 6.5.4 Approval phase
- 6.5.5 Deviation request
- 6.6 Procurement of materials
- 6.6.1 Procurement specifications
- 6.6.2 Incoming inspection procedure
- 6.7 Use of materials
- 6.7.1 Validation status of materials
- 6.7.2 Traceability of materials
- 6.7.3 Packaging, storage, removal from storage
- 6.7.4 Limited-life materials before implementation
- 6.7.5 Limited-life materials after implementation
- 6.7.6 Materials' non-conformances and alerts
- 6.7.7 Health and safety
- 7 Mechanical parts control
- 7.1 Verification of mechanical parts
- 7.2 Selection
- 7.3 Declared mechanical parts list
- 7.4 Criticality analysis
- 7.5 Evaluation and qualification phases
- 7.5.1 General
- 7.5.2 Evaluation phase
- 7.5.3 Qualification phase
- 7.5.4 Approval phase
- 7.5.5 Deviation request
- 7.6 Procurement of mechanical parts
- 7.6.1 General
- 7.6.2 Procurement specification
- 7.6.3 Source inspection
- 7.6.4 Incoming inspection procedure
- 7.7 Use of mechanical parts
- 7.7.1 Qualification status of mechanical parts
- 7.7.2 Traceability of mechanical parts
- 7.7.3 Packaging, storage, removal from storage
- 7.7.4 Limited-life mechanical parts or parts subject to wearout
- 7.7.5 Mechanical parts non-conformances and alerts
- 8 Process control
- 8.1 Specifications or procedures
- 8.2 Process selection and training
- 8.3 Declared processes list content
- 8.4 Criticality analysis
- 8.5 Evaluation and verification phase
- 8.5.1 General
- 8.5.2 Evaluation phase
- 8.5.3 Verification phase
- 8.5.4 Approval phase
- 8.5.5 Deviation request
- 8.6 Use of a process
- 8.6.1 Verification status of a process
- 8.6.2 Re-verification of a process
- 8.6.3 Implementation of a process
- 8.6.4 Traceability of processes
- 8.6.5 Process non-conformances and alerts
- 8.6.6 Mandatory inspection points (MIPs)
- 8.6.7 Packaging, storage, removal from storage
- Annex A (informative) Relationship between materials, mechanical parts,processes activities and programme phase
- Annex B (normative) Declared materials list — Document requirements definition
- Annex C (normative) Declared mechanical parts list — Document requirements definition
- Annex D (normative) Declared processes list — Document requirements definition
- Annex E (normative) Request for approval (RFA) — Document requirements definition
- Bibliography [Go to Page]