Already a subscriber? 

MADCAD.com Free Trial
Sign up for a 3 day free trial to explore the MADCAD.com interface, PLUS access the
2009 International Building Code to see how it all works.
If you like to setup a quick demo, let us know at support@madcad.com
or +1 800.798.9296 and we will be happy to schedule a webinar for you.
Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?
S+ IEC 60384-26 Ed. 2.0 en:2018 (Redline version) Fixed capacitors for use in electronic equipment - Part 26: Sectional specification - Fixed aluminium electrolytic capacitors with conductive polymer solid electrolyte, 2018
- Redline version (English only) [Go to Page]
- CONTENTS
- FOREWORD
- 1 General [Go to Page]
- 1.1 Scope
- 1.2 Object
- 1.3 Normative references
- 1.4 Information to be given in a detail specification [Go to Page]
- 1.4.1 General
- 1.4.2 Outline drawings and dimensions
- 1.4.3 Mounting
- 1.4.4 Rating and characteristics
- 1.4.5 Marking
- 1.5 Terms and definitions
- 1.6 Marking [Go to Page]
- 1.6.1 General
- 1.6.2 Information for marking
- 1.6.3 Marking on capacitors
- 1.6.4 Marking on packaging
- 2 Preferred ratings and characteristics [Go to Page]
- 2.1 Preferred characteristics
- 2.2 Preferred values of ratings [Go to Page]
- 2.2.1 Nominal capacitance (CN)
- 2.2.2 Tolerance on nominal capacitance
- 2.2.3 Rated voltage (UR)
- 2.2.4 Category voltage (UC)
- 2.2.5 Surge voltage
- 2.2.6 Rated temperature
- 3 Quality assessment procedures [Go to Page]
- 3.1 Primary stage of manufacture
- 3.2 Structurally similar components
- 3.3 Certified test records of released lots
- 3.4 Qualification approval (QA) procedures [Go to Page]
- 3.4.1 General
- 3.4.2 Qualification approval on the basis of the fixed sample size procedure
- 3.4.3 Tests
- 3.5 Quality conformance inspection [Go to Page]
- 3.5.1 Formation of inspection lots
- 3.5.2 The schedule
- 3.5.3 Delayed delivery
- 3.5.4 Assessment levels
- 4 Test and measurement procedures [Go to Page]
- 4.1 Pre-conditioning (if required)
- 4.2 Measuring conditions
- 4.3 Visual examination and check of dimensions [Go to Page]
- 4.3.1 General
- 4.3.2 Visual examination and check of dimensions
- 4.3.3 Requirements
- 4.4 Electrical tests [Go to Page]
- 4.4.1 Leakage current
- 4.4.2 Capacitance
- 4.4.3 Tangent of loss angle (tan ()
- 4.4.4 Equivalent series resistance (ESR)
- 4.5 Robustness of terminations [Go to Page]
- 4.5.1 General
- 4.5.2 Initial inspection
- 4.5.3 Final inspections and requirements
- 4.6 Resistance to soldering heat [Go to Page]
- 4.6.1 General
- 4.6.2 Initial inspection
- 4.6.3 Test conditions
- 4.6.4 Final inspections and requirements
- 4.7 Solderability [Go to Page]
- 4.7.1 General
- 4.7.2 Test conditions
- 4.7.3 Final inspections and requirements
- 4.8 Rapid change of temperature [Go to Page]
- 4.8.1 General
- 4.8.2 Initial inspection
- 4.8.3 Test conditions
- 4.8.4 Recovery
- 4.8.5 Final inspections and requirements
- 4.9 Vibration [Go to Page]
- 4.9.1 General
- 4.9.2 Test conditions
- 4.9.3 Final inspections and requirements
- 4.10 Shock [Go to Page]
- 4.10.1 General
- 4.10.2 Test conditions
- 4.10.3 Final inspections and requirements
- 4.11 Bump [Go to Page]
- 4.11.1 General
- 4.11.2 Test conditions
- 4.11.3 Final inspections and requirements
- 4.12 Climatic sequence [Go to Page]
- 4.12.1 General
- 4.12.2 Initial inspection
- 4.12.3 Dry heat
- 4.12.4 Damp heat, cyclic, Test Db, first cycle
- 4.12.5 Cold
- 4.12.6 Damp heat, cyclic, Test Db, remaining cycles
- 4.12.7 Recovery
- 4.12.8 Final inspections and requirements
- 4.13 Damp heat, steady state [Go to Page]
- 4.13.1 General
- 4.13.2 Initial inspection
- 4.13.3 Test conditions
- 4.13.4 Recovery
- 4.13.5 Final inspections and requirements
- 4.14 Endurance [Go to Page]
- 4.14.1 General
- 4.14.2 Initial inspection
- 4.14.3 Test conditions
- 4.14.4 Recovery
- 4.14.5 Final inspections and requirements
- 4.15 Surge [Go to Page]
- 4.15.1 General
- 4.15.2 Initial inspection
- 4.15.3 Test conditions
- 4.15.4 Recovery
- 4.15.5 Final inspections and requirements
- 4.16 Reverse voltage (if required) [Go to Page]
- 4.16.1 Initial inspection
- 4.16.2 Test conditions
- 4.16.3 Recovery
- 4.16.4 Final inspections and requirements
- 4.17 Component solvent resistance (if required)
- 4.18 Solvent resistance of the marking (if required)
- 4.19 Storage at high temperature [Go to Page]
- 4.19.1 General
- 4.19.2 Initial inspection
- 4.19.3 Test conditions
- 4.19.4 Recovery
- 4.19.5 Final inspections and requirements
- 4.20 Characteristics at high and low temperature [Go to Page]
- 4.20.1 General
- 4.20.2 Inspections and requirements
- 4.21 Charge and discharge (if required) [Go to Page]
- 4.21.1 General
- 4.21.2 Initial inspection
- 4.21.3 Test conditions
- 4.21.4 Final inspections and requirements
- 4.22 High surge current (if required) [Go to Page]
- 4.22.1 General
- 4.22.2 Initial inspection
- 4.22.3 Final inspections and requirements
- Bibliography
- Tables [Go to Page]
- Table 1 – Surge voltages
- Table 2 – Sampling plan for qualification approval, assessment level EZ
- Table 3 – Test schedule for qualification approval (1 of 6)
- Table 4 – Lot-by-lot inspection
- Table 5 – Periodic inspection
- International standard (Bilingual) [Go to Page]
- English [Go to Page]
- CONTENTS
- FOREWORD
- 1 General [Go to Page]
- 1.1 Scope
- 1.2 Object
- 1.3 Normative references
- 1.4 Information to be given in a detail specification [Go to Page]
- 1.4.1 General
- 1.4.2 Outline drawings and dimensions
- 1.4.3 Mounting
- 1.4.4 Rating and characteristics
- 1.4.5 Marking
- 1.5 Terms and definitions
- 1.6 Marking [Go to Page]
- 1.6.1 General
- 1.6.2 Information for marking
- 1.6.3 Marking on capacitors
- 1.6.4 Marking on packaging
- 2 Preferred ratings and characteristics [Go to Page]
- 2.1 Preferred characteristics
- 2.2 Preferred values of ratings [Go to Page]
- 2.2.1 Nominal capacitance (CN)
- 2.2.2 Tolerance on nominal capacitance
- 2.2.3 Rated voltage (UR)
- 2.2.4 Category voltage (UC)
- 2.2.5 Surge voltage
- 2.2.6 Rated temperature
- 3 Quality assessment procedures [Go to Page]
- 3.1 Primary stage of manufacture
- 3.2 Structurally similar components
- 3.3 Certified test records of released lots
- 3.4 Qualification approval (QA) procedures [Go to Page]
- 3.4.1 General
- 3.4.2 Qualification approval on the basis of the fixed sample size procedure
- 3.4.3 Tests
- 3.5 Quality conformance inspection [Go to Page]
- 3.5.1 Formation of inspection lots
- 3.5.2 The schedule
- 3.5.3 Delayed delivery
- 3.5.4 Assessment levels
- 4 Test and measurement procedures [Go to Page]
- 4.1 Pre-conditioning (if required)
- 4.2 Measuring conditions
- 4.3 Visual examination and check of dimensions [Go to Page]
- 4.3.1 General
- 4.3.2 Visual examination and check of dimensions
- 4.3.3 Requirements
- 4.4 Electrical tests [Go to Page]
- 4.4.1 Leakage current
- 4.4.2 Capacitance
- 4.4.3 Tangent of loss angle (tan δ)
- 4.4.4 Equivalent series resistance (ESR)
- 4.5 Robustness of terminations [Go to Page]
- 4.5.1 General
- 4.5.2 Initial inspection
- 4.5.3 Final inspections and requirements
- 4.6 Resistance to soldering heat [Go to Page]
- 4.6.1 General
- 4.6.2 Initial inspection
- 4.6.3 Test conditions
- 4.6.4 Final inspections and requirements
- 4.7 Solderability [Go to Page]
- 4.7.1 General
- 4.7.2 Test conditions
- 4.7.3 Final inspections and requirements
- 4.8 Rapid change of temperature [Go to Page]
- 4.8.1 General
- 4.8.2 Initial inspection
- 4.8.3 Test conditions
- 4.8.4 Recovery
- 4.8.5 Final inspections and requirements
- 4.9 Vibration [Go to Page]
- 4.9.1 General
- 4.9.2 Test conditions
- 4.9.3 Final inspections and requirements
- 4.10 Shock [Go to Page]
- 4.10.1 General
- 4.10.2 Test conditions
- 4.10.3 Final inspections and requirements
- 4.11 Bump [Go to Page]
- 4.11.1 General
- 4.11.2 Test conditions
- 4.11.3 Final inspections and requirements
- 4.12 Climatic sequence [Go to Page]
- 4.12.1 General
- 4.12.2 Initial inspection
- 4.12.3 Dry heat
- 4.12.4 Damp heat, cyclic, Test Db, first cycle
- 4.12.5 Cold
- 4.12.6 Damp heat, cyclic, Test Db, remaining cycles
- 4.12.7 Recovery
- 4.12.8 Final inspections and requirements
- 4.13 Damp heat, steady state [Go to Page]
- 4.13.1 General
- 4.13.2 Initial inspection
- 4.13.3 Test conditions
- 4.13.4 Recovery
- 4.13.5 Final inspections and requirements
- 4.14 Endurance [Go to Page]
- 4.14.1 General
- 4.14.2 Initial inspection
- 4.14.3 Test conditions
- 4.14.4 Recovery
- 4.14.5 Final inspections and requirements
- 4.15 Surge [Go to Page]
- 4.15.1 General
- 4.15.2 Initial inspection
- 4.15.3 Test conditions
- 4.15.4 Recovery
- 4.15.5 Final inspections and requirements
- 4.16 Reverse voltage (if required) [Go to Page]
- 4.16.1 Initial inspection
- 4.16.2 Test conditions
- 4.16.3 Recovery
- 4.16.4 Final inspections and requirements
- 4.17 Component solvent resistance (if required)
- 4.18 Solvent resistance of the marking (if required)
- 4.19 Storage at high temperature [Go to Page]
- 4.19.1 General
- 4.19.2 Initial inspection
- 4.19.3 Test conditions
- 4.19.4 Recovery
- 4.19.5 Final inspections and requirements
- 4.20 Characteristics at high and low temperature [Go to Page]
- 4.20.1 General
- 4.20.2 Inspections and requirements
- 4.21 Charge and discharge (if required) [Go to Page]
- 4.21.1 General
- 4.21.2 Initial inspection
- 4.21.3 Test conditions
- 4.21.4 Final inspections and requirements
- 4.22 High surge current (if required) [Go to Page]
- 4.22.1 General
- 4.22.2 Initial inspection
- 4.22.3 Final inspections and requirements
- Bibliography
- Tables [Go to Page]
- Table 1 – Surge voltages
- Table 2 – Sampling plan for qualification approval, assessment level EZ
- Table 3 – Test schedule for qualification approval (1 of 6)
- Table 4 – Lot-by-lot inspection
- Table 5 – Periodic inspection
- Français [Go to Page]
- SOMMAIRE
- AVANT-PROPOS
- 1 Généralités [Go to Page]
- 1.1 Domaine d'application
- 1.2 Objet
- 1.3 Références normatives
- 1.4 Informations devant figurer dans une spécification particulière [Go to Page]
- 1.4.1 Généralités
- 1.4.2 Dessins d’encombrement et dimensions
- 1.4.3 Montage
- 1.4.4 Valeurs assignées et caractéristiques
- 1.4.5 Marquage
- 1.5 Termes et définitions
- 1.6 Marquage [Go to Page]
- 1.6.1 Généralités
- 1.6.2 Informations relatives au marquage
- 1.6.3 Marquage sur les condensateurs
- 1.6.4 Marquage sur l’emballage
- 2 Valeurs assignées et caractéristiques préférentielles [Go to Page]
- 2.1 Caractéristiques préférentielles
- 2.2 Valeurs assignées préférentielles [Go to Page]
- 2.2.1 Capacité nominale (CN)
- 2.2.2 Tolérance sur la capacité nominale
- 2.2.3 Tension assignée (UR)
- 2.2.4 Tension de la catégorie (UC)
- 2.2.5 Surtension
- 2.2.6 Température assignée
- 3 Procédures d’assurance de la qualité [Go to Page]
- 3.1 Etape initiale de fabrication
- 3.2 Modèles associables
- 3.3 Enregistrements d'essais certifiés de lots livrés
- 3.4 Procédures d’homologation (QA) [Go to Page]
- 3.4.1 Généralités
- 3.4.2 Homologation s'appuyant sur la procédure utilisant un nombre d'échantillons fixe
- 3.4.3 Essais
- 3.5 Contrôle de conformité de la qualité [Go to Page]
- 3.5.1 Formation des lots de contrôle
- 3.5.2 Programme d’essais
- 3.5.3 Livraison différée
- 3.5.4 Niveaux d’assurance
- 4 Procédures d’essais et de mesures [Go to Page]
- 4.1 Préconditionnement (s'il est exigé)
- 4.2 Conditions de mesure
- 4.3 Examen visuel et contrôle des dimensions [Go to Page]
- 4.3.1 Généralités
- 4.3.2 Examen visuel et contrôle des dimensions
- 4.3.3 Exigences
- 4.4 Essais électriques [Go to Page]
- 4.4.1 Courant de fuite
- 4.4.2 Capacité
- 4.4.3 Tangente de l’angle de perte (tan δ)
- 4.4.4 Résistance série équivalente
- 4.5 Robustesse des sorties [Go to Page]
- 4.5.1 Généralités
- 4.5.2 Contrôle initial
- 4.5.3 Contrôles finaux et exigences
- 4.6 Résistance à la chaleur de brasage [Go to Page]
- 4.6.1 Généralités
- 4.6.2 Contrôle initial
- 4.6.3 Conditions d’essai
- 4.6.4 Contrôles finaux et exigences
- 4.7 Brasabilité [Go to Page]
- 4.7.1 Généralités
- 4.7.2 Conditions d’essai
- 4.7.3 Contrôles finaux et exigences
- 4.8 Variations rapides de température [Go to Page]
- 4.8.1 Généralités
- 4.8.2 Contrôle initial
- 4.8.3 Conditions d’essai
- 4.8.4 Rétablissement
- 4.8.5 Contrôles finaux et exigences
- 4.9 Vibrations [Go to Page]
- 4.9.1 Généralités
- 4.9.2 Conditions d’essai
- 4.9.3 Contrôles finaux et exigences
- 4.10 Chocs [Go to Page]
- 4.10.1 Généralités
- 4.10.2 Conditions d’essai
- 4.10.3 Contrôles finaux et exigences
- 4.11 Secousses [Go to Page]
- 4.11.1 Généralités
- 4.11.2 Conditions d’essai
- 4.11.3 Contrôles finaux et exigences
- 4.12 Séquence climatique [Go to Page]
- 4.12.1 Généralités
- 4.12.2 Contrôle initial
- 4.12.3 Chaleur sèche
- 4.12.4 Chaleur humide, cyclique, Essai Db, premier cycle
- 4.12.5 Froid
- 4.12.6 Chaleur humide, cyclique, essai Db, cycles restants
- 4.12.7 Rétablissement
- 4.12.8 Contrôles finaux et exigences
- 4.13 Chaleur humide, essai continu [Go to Page]
- 4.13.1 Généralités
- 4.13.2 Contrôle initial
- 4.13.3 Conditions d’essai
- 4.13.4 Rétablissement
- 4.13.5 Contrôles finaux et exigences
- 4.14 Endurance [Go to Page]
- 4.14.1 Généralités
- 4.14.2 Contrôle initial
- 4.14.3 Conditions d’essai
- 4.14.4 Rétablissement
- 4.14.5 Contrôles finaux et exigences
- 4.15 Surtension [Go to Page]
- 4.15.1 Généralités
- 4.15.2 Contrôle initial
- 4.15.3 Conditions d’essai
- 4.15.4 Rétablissement
- 4.15.5 Contrôles finaux et exigences
- 4.16 Tension inverse (si elle est exigée) [Go to Page]
- 4.16.1 Contrôle initial
- 4.16.2 Conditions d’essai
- 4.16.3 Rétablissement
- 4.16.4 Contrôles finaux et exigences
- 4.17 Résistance au solvant des composants (si cela est exigé)
- 4.18 Résistance au solvant du marquage (si cela est exigé)
- 4.19 Stockage à haute température [Go to Page]
- 4.19.1 Généralités
- 4.19.2 Contrôle initial
- 4.19.3 Conditions d’essai
- 4.19.4 Rétablissement
- 4.19.5 Contrôles finaux et exigences
- 4.20 Caractéristiques à haute et basse température [Go to Page]
- 4.20.1 Généralités
- 4.20.2 Contrôles et exigences
- 4.21 Charge et décharge (si elles sont exigées) [Go to Page]
- 4.21.1 Généralités
- 4.21.2 Contrôle initial
- 4.21.3 Conditions d’essai
- 4.21.4 Contrôles finaux et exigences
- 4.22 Surintensité élevée (si elle est exigée) [Go to Page]
- 4.22.1 Généralités
- 4.22.2 Contrôle initial
- 4.22.3 Contrôles finaux et exigences
- Bibliographie
- Tableaux [Go to Page]
- Tableau 1 – Surtensions
- Tableau 2 – Plan d’échantillonnage pour homologation, niveau d’assurance EZ
- Tableau 3 – Programme d’essais pour homologation (1 sur 6)
- Tableau 4 – Contrôle lot par lot
- Tableau 5 – Contrôle périodique [Go to Page]